1. |
The Site layout and building locations shall be in compliance with the following development regulations, consistent with the purpose of this Provision, and in general accordance with the Site Plan as illustrated on Appendix II to the satisfaction of the Development Officer in consultation with Transportation Services. |
2. |
Landscaping for all required Setbacks and pedestrian easements shall contain 10% more trees and shrubs than the landscaping requirements of the Zoning Bylaw. In addition, all pedestrian easements within sub-areas A, B and C shall use enhanced landscaping measures such as pedestrian oriented lighting, special paving treatments and street furniture such as benches. |
3. |
The required landscape plan shall be prepared by a Landscape Architect registered with the Alberta Association of Landscape Architects, and shall incorporate mature trees existing on the Site wherever possible, to the satisfaction of the Development Officer. |
4. |
Architectural diversity and visual interest shall be created through the use of distinctive treatments of building Façades and individual front entrances along the surrounding street. |
5. |
Expressions of higher quality and aesthetically pleasing development shall be created by utilizing one or more of the following regulations: |
|
a. |
Use of high quality finishing materials such as brick and stone; |
b. |
Consistent and/or complimentary use of finishing materials and screening or concealing of mechanical equipment so as to be unobtrusive; |
c. |
Establishing well-landscaped interior and exterior streetscapes, and pedestrian areas utilizing existing and new mature trees; |
d. |
Use of gardens where possible at Grade and on Rooftop Terraces and Green Roofs; and |
e. |
Artwork identified at both the north and south perimeter aligning generally with 130 Street and 128 Street shall be located entirely within private property. |
|
6. |
Buildings shall be dispersed and separated by on-Site roadways, landscaped Amenity Areas and/or surface parking areas to reduce the perception of height and massing of built forms. |
7. |
A Wind Impact Study shall be prepared and submitted with a Development Permit application for any building or portion of a building with a minimum Height of 23.0 m. The development shall incorporate design features to minimize adverse microclimatic effects such as wind tunneling, snow drifting, and rain sheeting, both on and off Site, consistent with the recommendations of the Wind Impact Study. |
8. |
Opportunities shall be created for pedestrian circulation throughout the Site by providing sidewalks within pedestrian easements and connecting walkways between interior roadways, Amenity Areas and parking areas while adhering to the principles of Crime Prevention Through Environmental Design. Details relative to the alignment and physical separation from adjacent private roadways will be reviewed upon submission of subsequent Development Permit applications. |
9. |
Pedestrian linkages between Multi-unit Housing and surface parking areas shall be as direct as possible. All parking, except visitor and service parking, shall be located underground, except for Single Detached Housing in Area ”E”. |
10. |
A 1.5 m sidewalk shall be provided along the north and south sides of 114 Avenue and the south side of 115 Avenue adjacent to the subject Site. The sidewalk required along 115 Avenue may be located either within road right-of-way or on private property with a Sidewalk Utility Right-of-Way Agreement, to the satisfaction of the Development Officer in consultation with Subdivision and Development Coordination (Transportation). The details of the alignment of the required sidewalk along 115 Avenue will be determined with the submission and review of the first development application for the Site. |
11. |
A minimum Amenity Area shall be provided for each Dwelling in accordance with the Zoning Bylaw. |
12. |
An Amenity Area in the form of a 0.38 hectare Site for a community park exists at the southwest corner of 127 Street and 115 Avenue. Other Amenity Areas may be dispersed throughout the Site. |
13. |
The owner shall enter into an Agreement (or Agreements) with the City of Edmonton for off-Site improvements to the park on the southwest corner of 115 Avenue and 127 Street, including a walkway and lighting, to the satisfaction of the Development Officer, in consultation with the Open Space Planning and Design Section in the Infrastructure Planning and Design Branch. |
14. |
The owner shall enter into an Agreement with the City of Edmonton for off-Site improvements necessary to serve the development to the satisfaction of the Development Officer in consultation with Subdivision and Development Coordination (Transportation) and Building Great Neighbourhoods. The Agreement process includes an engineering drawing review and approval process. Improvements to be addressed in the Agreement include, but are not limited to the following: |
|
a. |
removal of the existing abandoned bus pad and curb line sidewalk on the northwest corner of 114 Avenue and 128 Street intersection and the connector walk located on the north side of 114 Avenue between 128 Street and St. Albert Trail; |
b. |
Construction of a 1.8 m boulevard sidewalk on the north and south side of 114 Avenue, between 128 Street and St. Albert Trail; |
c. |
Construction of a sidewalk on the south side of 115 Avenue; |
d. |
Construction of a shelter pad with bus shelter on the southeast corner of the 114 Avenue and St. Albert Trail intersection for Bus Stop #1078; |
e. |
Removal of existing accesses as necessary, to St. Albert Trail, 115 Avenue and 114 Avenue, construction of the curb and gutter and restoration of the boulevard to the satisfaction of Subdivision and Development Coordination (Transportation); |
f. |
Construction of accesses and associated curb ramps; |
g. |
Construction of the drop-off/lay-by; and |
h. |
Repair of any damage to the abutting roadways, sidewalks and/or boulevards resulting from construction of the development, to the satisfaction of Subdivision and Development Coordination (Transportation). The Site must be inspected by Subdivision and Development Coordination (Transportation) prior to the start of construction and once again when construction is complete. |
i. |
Should any of the above improvements have been constructed under Building Great Neighbourhoods’ neighbourhood renewal program for Inglewood (under construction 2019-2021) then the owner shall reimburse the City for the construction costs incurred for such improvements. |
|
15. |
Notwithstanding the vehicular parking and loading requirements of the Zoning Bylaw, residential parking stalls shall be provided within an underground Parking Garage and visitor and commercial parking and loading stalls shall be provided in surface parking lots dispersed throughout the Site. At the discretion of the Development Officer, in consultation with Parking Services, parking reductions may be considered. |
16. |
The following additional regulations shall apply to any Child Care Services: |
|
a. |
This Use shall be located in a structure containing a residential Use; and |
b. |
This Use shall be located at Grade with a separate outside entrance and adjacent parking areas. |
|
17. |
The following additional regulations shall apply to commercial Uses in Areas B and C: |
|
a. |
The total Floor Area for each individual Use shall not exceed 275 m2; |
b. |
The total maximum Floor Area for commercial Uses shall not exceed 500 m2; |
c. |
Commercial Uses shall not be permitted in any freestanding structure separate from a structure containing a residential Use; and |
d. |
Commercial Uses shall be located at Grade and shall be provided with adjacent parking and outside entrances separate from entrances used for the residential Uses. |
|
18. |
Signs shall comply with the regulations contained in Schedule 59B of the Zoning Bylaw. |
19. |
Trash collection areas shall be screened from view from any adjacent Sites and separated from the pedestrian circulation system through the Site, in accordance with the Zoning Bylaw. |
20. |
A phasing plan shall be provided at the initial Development Permit stage, to the satisfaction of the Development Officer, to ensure that renovation or demolition of the former hospital building occurs prior to the development to the remainder of the Site. |
21. |
Crime Prevention Through Environmental Design principles shall be used to design all public and private spaces and facilities, focusing on natural surveillance and access control to lessen the likelihood of crime within the precinct. |
22. |
Where possible, include low impact development landscaping practices and Green Buildings design principles, to the satisfaction of the Development Officer. |
23. |
Prior to Site preparation or the issuance of a Development Permit, the Historical Resources Management Branch of Alberta Culture and Community Spirit shall be consulted regarding any additional requirements pursuant to the Alberta Historical Resources Act. |
24. |
Prior to the issuance of any Development Permit, the Development Officer shall ensure that a signed agreement has been executed between the City and the owner, requiring the owner to provide the City at the time of Development Permit approval, the option to purchase 5% of the proposed number of residential units at 85% of the market price. |
25. |
The lobby mural in the former Charles Camsell Hospital building shall be retained, restored and incorporated into the renovated or replacement building on Area B. |
26. |
Prior to the issuance of a Development Permit, except for Development Permits for demolition, excavation, shoring or signage, the applicant shall submit documentation that demonstrates, to the satisfaction of the Development Officer in consultation with Fire Rescue Services and EPCOR Water Services, that the fire flows and water servicing to the Site will be adequate for the proposed building and construction type, and be in accordance with the City of Edmonton Design and Construction Standards. The Development Officer shall verify that any infrastructure upgrades or systems required to ensure these standards are met shall be implemented in the design of the building and/or through off-site improvements. |