To mitigate the potential negative effects of a flood event and ensure the safety of those living in lands partially or wholly contained within the defined floodplains of the North Saskatchewan River and its tributaries.
3.1. | For the development of a parcel of land partially or wholly contained within the Floodplain Protection Overlay, the applicant must submit a certificate from a qualified, registered professional engineer or architect that indicates: | ||||||||||||||
|
|||||||||||||||
3.2. | In addition to the requirements of Subsection 3.1, for the development of a parcel of land partially or wholly contained within the Floodplain Protection Overlay, the Development Planner may require the applicant to submit: | ||||||||||||||
|
|||||||||||||||
3.3. | The requirements listed in Subsections 3.1 and 3.2.3 must be authenticated and validated professional work products, prepared by either a qualified Professional Engineer (P Eng.) licensed by the Association of Professional Engineers and Geoscientists of Alberta to practice in Alberta or a registered architect. The submitted requirements must include: | ||||||||||||||
|
|||||||||||||||
3.4. | The Development Planner must impose conditions in accordance with the recommendations identified in the certificate outlined in 3.1 to ensure that the development complies with the floodplain management policies of the applicable statutory plans and to ensure any specific design concerns outlined in 3.2.3 have been addressed. |